Not much time to work on the model today. Only managed to sand down the joint line of the bazooka and primed to check. This I find is the most tedious phase.
24 rivet heads to install 😉
I drill a 0.8mm hole to hold the liquid cement so that it would not overflow to the sides and create a mess.
Any other ways to do this cleanly?
could you drill a smaller hole in the very center – put in the rivet held on by take and then carefully wick some glue in from the bottom? Dont turn it upside down so the glue does not migrate oput the top? Maybe test something like this on a scrap piece?
p/s- not to forget, both syd and ryan also are undergoing evolution to be charmer and charmer in each and every episode.. and in this episode, are the […]
Kawamori designed the GP01 and GP02 originally. The original GP01 design was curvy, a bit squat in the chest and with some wildly exaggerated proportions… It’s a bit crazy-looking in some ways but there’s something I love about Kawamori’s designs that unfortunately rarely makes it to the model kit versions.
The MG GP01 and GP02 were redesigns…[Read more]